![GeoExchange, Done Right](http://www.stage3renewables.com/wp-content/uploads/2016/04/Smart-Circulator_2.jpg)
GeoExchange, Done Right
We were called to solve the problems and get this Geo-exchange performing as it should. This system was 8 years old, with a history of failed compressors, nuisance trips and high energy consumption. 5 commercial 3 phase heat pumps are distributed around a 2 acre facility.